Finally got my Internet back up and running!
 (#52) All strips to form the outside frame of the shelves cut out and grooved to receive the bottom of the shelf. 
 
 (#53) Cutting the air circulation holes in the bottom of the shelves. 
 
 (#54) First shelf bottom cut out! 
 
 (#55) First shelf glued together and finished!
 
 (#56) Short shelf bottom.
 
 (#57) First short shelf glued up.
 
 (#5 All shelves finally in! Decided to take the bottom one out in order to have a place to store full boxes of cigars. Think I still got plenty of space for singles LOL!
 
 
 
(#59) On to sealing around the door. Don't want a 100% air tight seal in the cabinet, but at least a 90%. It needs a little fresh air circulation in order to avoid molding. Ran foam sticky back weather stripping up the hinge side. 
 
 
 (#60) Bottom door seal. Used crushable Oasis floral foam all around the door to get the exact gap that needed to be filled for a tight fit. 
 
 
 (#61) Top door seal done in two pieces.
 
 (#62) Seal on the locking side.
 
 
 All and all its starting to come together nicely!